High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building

Product Details
Customization: Available
After-sales Service: Installation Guide
Install: Support Installation
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Plant Area
>2000 square meters
Management System Certification
ISO 9001, ISO 14001
OEM/ODM Availability
Yes
  • High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building
  • High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building
  • High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building
  • High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building
  • High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building
  • High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building
Find Similar Products

Basic Info.

Model NO.
Prefabricated Warehouse
Usage
Building Platforms, Industrial Platform, Leisure And Entertainment Platform, Stage And Viewing Platform, Transportation Platform, Warehouse Rack
Preservative Treatment
Twice Painted
Loading
20 Gp, 40HP, 40 Gp, 40 Ot
Standard
GB, ASTM, DIN, JIS, AISI, BS
Steel Type
Carbon Structural Steel
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Member
Steeltruss
Type of Steel for Building Structure
High-Strength Steel
Carbon Structural Steel
Q195
Residential Wall Structure
Wall Stud
Application
Steel Workshop, Steel Fabricated House,
Warranty
50 Year
Transport Package
Standard Sea Package
Specification
ISO, SGS, BV
Trademark
Jedha
Origin
China
HS Code
730890
Production Capacity
700000 Meter/Month

Product Description

Steel Building Benefits 
Using a combination of metal construction and pre-fabricated components provides three main advantages: 

Cost. 
Because erection labor is drastically reduced, you can save as much as 30% or more over more traditional construction methods.

Speed.
Because many of the components are pre-fabricated at our plant, construction time is greatly reduced.

Durability.
Steel building components are guaranteed to last 20 to 30 years without repainting or other maintenance. 
High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building1.Steel Structure Information: 
Type construction building
Wide span single span or multiple spans, the max span clear distance is 36m, without middle column
Roof and Wall option: Steel sheet,EPS, fiber glass, rock wool or PU sandwich panel
Door and Window PVC or Aluminum alloy; sliding door or rolled door
Column and Beam Option: hot rolled or welded H section, I section; painting or galvanized
Purlin Option: C-section or Z-section
Local Climate 1. Wind speed
2. Snow load 
3. Rain quantity
4. Earthquake grade if have
More details is preferred.
Crane Parameter  If need crane beam, crane tons parameter and lift height are needed
Drawing  1. according to clients' drawing
 2. design as per clients' dimension and requests
Package Naked loaded in shipping container or as per requests.
Loading  20 GP,  40HP, 40 GP,  40 OT

2.Our Technical Advantages:
A. We have our own technical teams, so we can designfabricate and install this steel structure workshop according to customers requirement.
B. It's very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service.
C. One stop shopping---we offer not only steel structure but also sandwich panels and all the accessories. It will ensure the perfect integration between each part.
D. fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection.

E.We have pretty good preservative treatment on this steel frame as follows,

  1. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer  

    antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions.

 

   2. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um;

     when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions.

High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building4.Features:
1. Item Name: steel structure warehouse/ workshop
2. Steel Material: Q235 and Q345.
3. Connection Type: bolted connection.
4. Preservative Treatment: painted
5. Advantages: fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection.
 
 
Steel structure workshop included the main structure( steel beam/girder, steel column/pillar), the secondary structure( roof and wall purlin, steel bracing, tie-bar, etc), door and windows, and other accessories.
 
A. We have our own technical teams, so we can design, fabricate and install this steel structure workshop according to customers requirement.
 
B. Its very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service.
 
 
C. We have pretty good preservative treatment on this steel frame as follows,
 

D. You can choose freely the roof and wall panel, included both types:

E. You can choose freely the material of door and windows

F. We also have so many accessories, for example, steel bracket, bolts, self-drilling screw, rivet, inter and outer cullis, rainspout, trimming sheet, glass cement, etc. you can buy them according to your exact requirement
High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure BuildingHigh Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building

Material destription:
High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure BuildingHigh Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure BuildingHigh Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building
Packing
High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building
Projects
High Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure BuildingHigh Quality PU Sandwich Roof Panel Insulation Plant Warehouse Construction for Warehouse/Workshop/Steel Structure Building

Our excellent design team will design the steel structure building for you. We can quote If you give the following information.

1 Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 Live load on roof(KN/M2), live load on second floor(KN/M2) if have
4 Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
5 Snow load (max. Snow height) _____kn/m2, _____mm
6 Anti-earthquake _____level
7 Brickwall needed or not If yes, 1.2m high or 1.5m high
8 Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former.
9 Door quantity & size _____units, _____(width)mm*_____(height)mm
10 Window quanity & size _____units, _____(width)mm*_____(height)mm
11 Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
12 Skylight belt, ventilator and any other accessories if needed.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier