Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room

Yantai Jedha Industrial and Trading Co., Ltd.
  • Audited Supplier
  • 6 yrs

Contact Supplier

Product Highlights

  • Cost Efficiency: Save 30% or more over traditional construction due to reduced erection labor.
  • Fast Construction: Pre-fabricated components significantly reduce on-site construction time.
  • Long Durability: Guaranteed to last 20 to 30 years without repainting or maintenance.
  • Wide Span Capability: Max clear span up to 36m without middle columns.
  • Customizable Design: Full customization available from designs, samples, and specific dimensions.
  • Robust Preservative Treatment: Hot-dip galvanized options offer 45-50 years warranty under normal conditions.
  • Earthquake Proofing: Stable structure designed to withstand seismic loads.
  • Comprehensive Support: Includes installation guides, technical support, and one-stop shopping for accessories.

Product Images of Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room

Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room pictures & photos
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room pictures & photos
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room pictures & photos
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room pictures & photos
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room pictures & photos
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room pictures & photos
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
  • Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
    Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
  • Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
    Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
  • Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
    Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
  • Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
    Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
  • Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
    Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
  • Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
    Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room

Find Similar Products

Product Description

Steel Building Benefits 
Using a combination of metal construction and pre-fabricated components provides three main advantages: 

Cost. 
Because erection labor is drastically reduced, you can save as much as 30% or more over more traditional construction methods.

Speed.
Because many of the components are pre-fabricated at our plant, construction time is greatly reduced.

Durability.
Steel building components are guaranteed to last 20 to 30 years without repainting or other maintenance. 
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room1.Steel Structure Information: 
Type construction building
Wide span single span or multiple spans, the max span clear distance is 36m, without middle column
Roof and Wall option: Steel sheet,EPS, fiber glass, rock wool or PU sandwich panel
Door and Window PVC or Aluminum alloy; sliding door or rolled door
Column and Beam Option: hot rolled or welded H section, I section; painting or galvanized
Purlin Option: C-section or Z-section
Local Climate 1. Wind speed
2. Snow load 
3. Rain quantity
4. Earthquake grade if have
More details is preferred.
Crane Parameter  If need crane beam, crane tons parameter and lift height are needed
Drawing  1. according to clients' drawing
 2. design as per clients' dimension and requests
Package Naked loaded in shipping container or as per requests.
Loading  20 GP,  40HP, 40 GP,  40 OT

2.Our Technical Advantages:
A. We have our own technical teams, so we can design, fabricate and install this steel structure workshop according to customers requirement.
B. It's very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service.
C. One stop shopping---we offer not only steel structure but also sandwich panels and all the accessories. It will ensure the perfect integration between each part.
D. fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection.

E.We have pretty good preservative treatment on this steel frame as follows,

  1. Clean the steel( reach to Sa2.5 Grade, China Code), then we will spray paint: 2 layer epoxy zinc rich primer and 2 layer  

    antirust paint( total thickness: 100-120um); Warranty period: 18-20 years under normal conditions.

 

   2. Hot-dipped galvanized, when the thickness of parts is less than 5mm,thickness of hot-dipped gal is more than 65um;

     when equal to or more than 5mm, that is more than 86um. Warranty period: 45-50 years under normal conditions.

Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room4.Features:
1. Item Name: steel structure warehouse/ workshop
2. Steel Material: Q235 and Q345.
3. Connection Type: bolted connection.
4. Preservative Treatment: painted
5. Advantages: fast construction, easy installation, stable structure, earthquake proofing, energy conserving and environment protection.
 
 
Steel structure workshop included the main structure( steel beam/girder, steel column/pillar), the secondary structure( roof and wall purlin, steel bracing, tie-bar, etc), door and windows, and other accessories.
 
A. We have our own technical teams, so we can design, fabricate and install this steel structure workshop according to customers requirement.
 
B. Its very easy to install the steel structure workshop in your there according to our installation drawings. Also, we will supply all technical support during installation and after-sale service.
 
 
C. We have pretty good preservative treatment on this steel frame as follows,
 

D. You can choose freely the roof and wall panel, included both types:

E. You can choose freely the material of door and windows

F. We also have so many accessories, for example, steel bracket, bolts, self-drilling screw, rivet, inter and outer cullis, rainspout, trimming sheet, glass cement, etc. you can buy them according to your exact requirement
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed RoomLight Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room

Material destription:
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed RoomLight Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed RoomLight Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
Packing
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room
Projects
Light Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed RoomLight Steel Villa Factory Price Easy to Install Steel Structure for Prefabricated Building/Warehouse/Workshop/Steel Shed Room

Our excellent design team will design the steel structure building for you. We can quote If you give the following information.

1 Location (where will be built? ) _____country, area
2 Size: Length*width*height _____mm*_____mm*_____mm
3 Live load on roof(KN/M2), live load on second floor(KN/M2) if have
4 Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
5 Snow load (max. Snow height) _____kn/m2, _____mm
6 Anti-earthquake _____level
7 Brickwall needed or not If yes, 1.2m high or 1.5m high
8 Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former.
9 Door quantity & size _____units, _____(width)mm*_____(height)mm
10 Window quanity & size _____units, _____(width)mm*_____(height)mm
11 Crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
12 Skylight belt, ventilator and any other accessories if needed.

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2452132". Items marked "verified" are certified.

Watch Video
Watch Video
Yantai Jedha Industrial and Trading Co., Ltd.
Yantai Jedha Industrial and Trading Co., Ltd.
Yantai Jedha Industrial and Trading Co., Ltd.
Yantai Jedha Industrial and Trading Co., Ltd.
Yantai Jedha Industrial and Trading Co., Ltd.
Yantai Jedha Industrial and Trading Co., Ltd.
Yantai Jedha Industrial and Trading Co., Ltd.
Yantai Jedha Industrial and Trading Co., Ltd.

About Our Factory & Business Background

verified Business Type
Trading Company
Address
No. 61 Hongfu Street, Fushan District, Yantai
verified Plant Area
68 square meters
verified Number of Employees
5
verified Registered Capital
3,000,000 RMB
verified Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment
verified International Commercial Terms(Incoterms)
FOB, CIF, CFR, EXW
verified Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
verified Nearest Port
Qingdao Port
verified Minimum Order Quantity
1 Pc
verified Supply Chain Partners
30

Our Production Capability & Technical Expertise

verified Main Products
Sandwich Panels, Steel Structure Buildings, Steel Structure, Prefabricated Building, EPS Sandwich Panel, Clean Room Panel, Polyurethane Sandwich Panel
verified Customization Options
Customization from Designs, Customization from Samples, Minor Customization, Full Customization, Flexible customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
1 people

Our Industry Experience & Global Business Record

verified Year of Establishment
2021-01-22
verified Export Year
3 Years
verified Main Markets
South America, Southeast Asia/ Mideast, Africa, Australia
verified Repeat Buyers Choice
50%~80%
verified Number of Foreign Trading Staff
3
verified Overseas Agent/Branch
No
verified New Products Launched in Last year
Yes

Our Certifications, Standards & Industry Recognition

verified Cooperated with Fortune 500
No

FAQ

What is the maximum span for the steel structure?
The maximum clear span distance is 36 meters without the need for middle columns.
How long is the warranty period for the steel frame?
Warranty periods vary by treatment: 18-20 years for painted frames and 45-50 years for hot-dip galvanized frames under normal conditions.
Can the structure be customized?
Yes, full customization is available from designs, samples, and specific dimensions including roof, wall, and door/window options.
What materials are used for the steel structure?
The steel material includes Q235 and Q345, with options for hot-rolled or welded H and I sections.
What are the available options for roof and wall panels?
Options include steel sheets, EPS, fiberglass, rock wool, or PU sandwich panels.
What is the lead time for production?
Peak season lead time is one month, while off-season lead time is within 15 workdays.
Do you provide installation support?
Yes, we provide installation guides, technical support during installation, and after-sale service.
What are the minimum order quantities?
The minimum order quantity is 1 piece.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now